When the budget cuts took effect at the Deaf Development Programme, we put up a small office and classroom building to eliminate the high rent we were paying. The building was behind schedule but it turned out OK–except for the floor. The workmen did a terrible job, leaving us with a real mess.
The floor had large areas of discoloration, paint drippings, and even started to disintegrate in spots after a week or two. I kept thinking the contractor would come back and do something but it soon became apparent he considered that job finished.